BGB students constructed Sanko in Roumari of Kurigram

A Sanko has been constructed by BGB students and community in Roumari upazila of Kurigram. A Sanko has been constructed on the Jinjiram river of about 450 feet length and width of 6 feet in Goitapara village of Shaulmari Union of Upazila. After completing five consecutive days of construction work, on Wednesday 4th September, BGB students and crowd cut the ribbon and officially opened it for the general public. This brought relief to the people of the area.
Locals said that the common people of the area were in extreme distress as the people of various professions including the local primary, secondary and college students were bringing and taking daily essential products from the bazaar. Many have crossed by boat risking their lives for urgent needs. A Sanko was built long ago by the initiative of the local residents. But it is destroyed by flood water. Since then, the locals risked crossing the Jinjiram river in the village of Gayata Para with extreme suffering. About 20,000 people from 8 villages on both sides travel in this direction. No one has come forward to alleviate the sufferings of the people of this long-neglected township.

Even though the residents demanded the construction of a permanent bridge, it was not implemented.
Jamalpur Battalion - 35 BGB under Gaytapara BGB camp members and students built a basar sanko on the river to reduce public suffering. With the overall cooperation of the local students and BGBB, small vehicles and bamboo sakoti were made for the movement of local residents.
Parvez Mosharraf, a local student, said that Sanko was built with the full cooperation of BGB and students, thinking about the suffering of the people of the area. No more suffering now. Auto driver Maynul said, earlier it was impossible to cross by boat. At present, the construction of Sanko has facilitated the passage of passengers including autos.
In this regard, Goitapara BGB Camp Naib Subedar AB Siddique said, as a part of public service work, bamboo fences have been constructed to alleviate suffering. As a result, relief has returned to the common people.
Upazila Engineer Manchurul Haque said that there is no allocation for now. Necessary measures will be taken in consultation with the higher authorities for the permanent construction of the bridge.
Upazila Executive Officer (UNO) Nahid Hasan Khan said that the matter will be reported to the higher authorities if the residents apply.
Advertisement
Most Readed - Country
- The story of the musical career, success and political controversy of the Prince of Music, Asif Akbar
- Asif Akbar's father was in the Peace Committee when the Muslim League was formed in 1971
- Polao rice price doubled, export or artificial crisis?
- Mirza Abbas is the victim of planned personal attacks by Nasiruddin Patwari: Rashed Khan
- Messi may be seen again in Argentina jersey, may be farewell match
- Bangladesh provides $1 million in aid to flood-hit Nepal
- Hridoy unbeaten on 350 runs, new history in Bangladesh cricket
- US strikes again in Iran, 18 killed and 142 injured
- The Story of Actress Shabana’s Struggles, Success and Departure from the Silver Screen
- Shapla Chattar massacre: Dipu Moni, Latif Siddiqui and 11 others in tribunal
- BPL may not happen this year: Tamim Iqbal
- Kangana Ranaut slams Naseeruddin Shah for calling him a 'fox'
- Who is Ruhul Kabir Rizvi? Education, political life and current responsibilities
- Young man leaves weapon at opponent's house, calls police, hangs himself
- If the referendum verdict is upheld, Oli Ahmed would have been the president: Jamaat
- 132 killed in strong earthquake in Colombia, state of emergency declared
- 15 artists including Boga Taleb to sing in memory of Razzak Dewan
- Preity Zinta is returning to films after eight years, says why she was in the dark
- Joining the Mecca Pact is Bangladesh's own matter: Jamaat Ameer
- Ronaldo is now the son-in-law of Argentina!




